Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Sep 06, 2023     firewall Insulation and passthrough - (2 hours)       Category: Firewall
Fabricated a small steel fairing for the air vent valve cables. I had redo the fairing as the previous one was too small.
Same process. Initially thought to rivet to the firewall, but then changed my mind and i will install to nutplates (-8 screws).


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.